Phase 7 of 8
Earning Professional Licensure
Usually 3–6 months
Preparing for and passing the professional practice exam or competence review in a chosen discipline (e.g. the PE exam in the US or chartership review in the UK). Gains legal authority to seal drawings and take responsibility for designs.
What you do
Once you meet your state’s education and experience requirements and have passed the FE, you apply to take the PE exam in a specific discipline such as civil: structural, transportation or water resources (Texas Board). The PE is a demanding, discipline focused exam of professional level competence, and in many jurisdictions it is a core requirement for licensure as a professional engineer (ASCE PS432).
- Check your state board’s rules carefully. Some allow you to sit for the PE exam before the full experience is complete, but you still must meet all requirements before you can be licensed (NCEES Licensure).
- Build a study plan around the NCEES exam specifications and reference handbook for your chosen PE exam, and practice working problems with the codes and standards you will use (NCEES PE).
- Budget for fees: NCEES currently charges about 400 dollars for most PE exams, and some boards add separate application or licensing fees (NCEES Policy).
After you pass and the board verifies your credentials, it issues a professional engineer license and registration number. You are now legally allowed to offer engineering services in that jurisdiction, subject to its laws and ongoing continuing education requirements. This phase ends with that license in hand.
You're done when
A professional engineer license or chartered engineer certificate with registration number.
Resources
Before and after
Track this phase, post your proof, and meet people in the same phase.
Join this road, free →